Create one row for each opening and one column for each proposal. Compare manufacturer, model, operation, exact width and height, frame depth and material, glass makeup, Low-E coating, tint, finish, grids, screens, hardware, handing, positive and negative pressures, approval, mullion, quantity, and unit price.
Then add project columns for tax, crating, freight, unloading, residential delivery, storage, removal, disposal, substrate repair, flashing, sealants, trim, paint, protection, permits, engineering, inspections, access equipment, punch work, warranty, and service. Mark missing information as unresolved instead of assuming it is included.





